Description
The WEDA small pump range are portable, lightweight and easily maintained. They provide a simple, cost effective solution for light duty applications. The design of the pump’s outer jacket for cooling and thermo protection keeps it running safely under a variety of conditions. The triple shaft seal assures a long lifetime and the semi vortex wet end minimises maintenance. Adjustable wear resistant rubber diffusers and hardened high chrome impellers ensure durability in tough environments.
The unique sealing system and modular design make this pump range one of the most flexible on the market.
WEDA Standard Features

* Not all of the features mentioned above are available on the WEDA small range of pumps – please check data sheets for exact details





